Systems
Automation, scripts, and performance optimization
Automation Runs Today
18
Avg Draft Time Saved
85%
Active Scripts
6
Errors / Failures
1
Active Scripts
RDRAW
Operational
Auto-generate ROW, BOC, bore line
15k ft in ~1 min
RDSET
Operational
Set drafting parameters
Standardized output
RDANN
Operational
Auto annotation / labeling
Reduces manual labeling time
RDCURVE
Testing
Handle curved alignment drafting
Maintains accuracy
Performance Impact
Manual Draft Time
Before: 2–3 days
After: 4–6 hours
Large Route (15k ft)
Before: 2–3 days
After: ~1 minute base generation
Revisions
Before: High rework
After: Minimal corrections
System Notes
Automation should always start from a clean centerline.
Offsets must match client-specific standards.
Scripts should be modular for each client variation.
Never sacrifice accuracy for speed.